Recording, Live Sound & Rehearsal | 300 E. Madison Ave, Clifton Heights, PA 19018 484.461.3240 | info@redplanetsound.com

Posted October 10th, 2011

We have just completed the second week of construction at Red Planet. I think it’s safe to say that we are all exhausted but we can’t slow down now. We still have much to do. This week we framed out and sheetrocked our amplifier isolation rooms, framed our drum isolation room and floored and partially framed our control room. Check out the pictures below. Mouse over for a brief description and click for a full size image.

Control room rear wall

Amp isolation room floors

Amp isolation room frame

Amp isolation room with door

Amp isolation rooms

Amp isolation rooms electric

Control room rear wall with drywall

Vocal booths rear wall frame

From left to right: vocal booths, control room, amp isolation rooms

Vocal booths frame

Drum room floor frame with insulation

Drum room floor

Control room second rear wall

Drum room frame

Vocal booths frame

Control room floor

From left to right: entrance, amp isolation rooms, drum room, vocal booths, control room

Control room frame

Control room ceiling frame

Control room frame

Control room frame



Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>